BUT Sport Facilities Operation to 31.08.2021
In accordance with the extraordinary measures of the Ministry of Health and the measures of BUT, it is possible to run sports activities on selected university sport facilities. The following rules will apply:
General operational guides for BUT sport facilities:
- entry into the complex:
- without symptoms of viral disease;
- after disinfection of hands at the entrance to the premises;
- movement in the area:
- wearing masks where the permitted distance cannot be observed;
- sports activities take place without wearing masks;
- changing rooms are not available;
- t is possible to use designated toilets;
- following the operational guides and instructions of TPO employees;
- TPO employees regularly take care of:
- disinfection of meeting points (entrance portal, reception, reserved toilets);
- emergency measures monitoring;
- regular inspection of the sport complex.
Athletic and multipurpose stadium, Technická 14
Outdoor sports areas are open from Mon to Fri from 7.00 to 21.00 under the following conditions:
- the general rules for the operation of BUT sports grounds apply;
- the beginnings of the training blocks start at 7.00, 8.30, 10.00, 11.30, 13.00, 14.30, 16.00, 17.30, 19.00 (unless otherwise agreed - long-term orders);
- the length of the training unit is 90 minutes;
- entrance to the complex:
- the complex opens 15 minutes before the beginning of the training unit;
- the complex closes 15 minutes after finishing the training unit;
- the area is closed during the training unit;
- group on the field according to current emergency measures;
- divisions train only at scheduled times; the division into sectors is based on the requirements of the sections (coordination by Mgr. Kotyza );
- groups enter the complex together;
- he coach is responsible for the training group;
- individuals can train at specific times and only when registered online;
- payment at the reception (we prefer payment by card);
- the reception is responsible for monitoring all applicable emergency measures.
Tennis courts with artificial surface, Technická 14
Tennis courts are open from Mon to Fri from 7.00 to 21.00 under the following conditions:
- the general rules for the operation of BUT sports grounds apply
- seasonal training units (payment by invoice) or booked online (payment at the reception);
- the beginnings of the training blocks start at 7.00, 8.30, 10.00, 1.30, 13.00, 14.30, 16.00, 17.30, 19.00 (unless otherwise agreed);
- the training unit duration is 60 minutes;
- the number of people on the court follows the current emergency measures;
- entrance to the complex:
- the complex opens 15 minutes before the start of the training unit,
- the complex closes 15 minutes after finishing the training unit,
- the area is closed during the training unit,
- the reception is responsible for monitoring all applicable emergency measures.
Badminton, Purkyňova 93
Badminton courts operate from Mon to Thu from 5 pm to 8 pm under the following conditions:
- the general rules for the operation of BUT sport grounds apply
- entrance to the complex:
- the complex opens 15 minutes before,
- the complex closes 15 minutes after finishing the training unit;
- the number of people on the field according to current emergency measures;
- individuals train at specified times and only in the case of online registration:
- payment at the reception (payment by car is preferred)
- the reception is responsible for monitoring all applicable emergency measures.
- from 1. 7. to 31.8. 2021, Purkyňova's badminton courts are out of order. However, it is possible to order 2 courts in the SA PPV complex - F1 gym according to the current online offer.
Sport hall, Technická 14
Training units and matches of floorball players based on the decision of the MZdr exception (top - professional sport).
All other BUT sport facilities are closed. If the risk assessment identifies any activity, space or facility that cannot be opened safely then the facility or spaces must remain closed or the activity suspended.
Brno, 17. 05. 2021 RNDr. Hana Lepková, Head of CESA BUT
Published | |
---|---|
Link | https://www.cesa.vut.cz/en/students/study/f99185/d212672 |
Responsibility: Ing. Bc. Eliška Žáková